Building Regulations are a separate matter. A new opening in a roof, or a whole new rooflight replacing an old one, is building work that has to meet the regulations, including the energy rules in Part L. For an existing home, the limit is 1.4 W/m²K for a roof window and 2.2 W/m²K for a rooflight. We fit to current regulations and handle the Building Control notification where the work needs one. Replacing only the glass in an existing frame is generally not notifiable. Our Building Regulations guide sets it all out.
Escape is the other rule people ask about. A roof window can only serve as an escape window for a storey within 4.5m of the ground, so in practice it suits bedrooms tucked under the roof of a single-storey or chalet-style bungalow. Converting the loft of an ordinary two-storey home is another matter, because that needs a protected stair down through the house, not an escape roof window. Building Control can be your council's own team or a registered building control approver, and on notifiable work we deal with the notification so you receive the paperwork at the end.
Cost
We do not publish a price list, because the cost depends on the roof, the size and type of unit, how it opens, the access, and the finishing inside. What we can say is what moves the price: an electric or solar unit costs more than a manual one; a new opening costs more than a like-for-like replacement; a conservation rooflight costs more than a standard one; and scaffolding, where it is needed, is a real part of the bill. The costs page gives typical UK ranges and explains each factor. Every quote we send is written, itemised and free.
Timing
A like-for-like roof window replacement is often a one-day job. A new opening with internal finishing, or a roof lantern on a new extension, takes longer, and the survey is where we set a realistic timescale for your house. See how long it takes to fit a skylight for the usual stages.
The wait before the work starts depends on the unit more than the fitting. Standard roof windows in common sizes are widely held by suppliers. Made-to-measure flat rooflights, conservation units and roof lanterns are built to order, so there is a gap between signing the quote and the fitting day. If planning permission or listed building consent is needed, that decision comes first and nothing is ordered until it is in hand. Weather plays a part too: we will not open a roof in driving rain, and a day lost to a storm moves the job rather than leaving your roof half done. In towns further out such as Clevedon or Portishead the timings are the same as in the city.
Whatever the job, the roof is made weathertight at the end of each day, and the work carries our 10-year workmanship guarantee.