How Long Does It Take to Fit a Skylight?
The short answer
A like-for-like swap of one roof window is typically a single working day, because the opening and the rafters are already there. Cutting a brand new opening, trimming the timbers and making good inside takes longer, usually several days, and a roof lantern on a flat roof sits somewhere in between. We close the roof up each evening, so nobody sleeps under a gap.
Swapping one unit for another
The quickest job is lifting out an old roof window and setting a new one in the same gap. The rafters are already trimmed, the flashing sits in a known place and the plasterboard lining is already cut to suit. Typically that is one working day for a single unit, from scaffold or roof ladders going up to the new sash being checked and wiped down.
The morning goes on the old unit. Slates or tiles around the frame are lifted and set aside, the old flashing comes away, and the frame is unscrewed from the rafters. After that the new frame is levelled, fixed and wrapped in its underlay collar, and the flashing is laid back into the courses. The afternoon is for the inner lining, the sash and a test that it opens and closes the way it should.
Two things can nudge that. A sash that is hard to reach, such as a sash up on a tall Clifton townhouse, needs more scaffold time. And a Victorian slate roof asks for care, because old slates are brittle and each one has to be lifted and reset by hand rather than pulled off in a batch.
Cutting a new opening
Cutting a fresh hole changes the picture entirely. The roof structure is opened up, the rafters trimmed and framed properly around the hole, and the load carried to the sound timbers either side. That is building work, and it has to be done to current regulations, so it cannot be rushed.
A typical sequence runs like this.
- Mark the position from inside and out, then confirm it against the rafter spacing.
- Strip the roof covering and cut the rafters to size, fitting trimmers either side and above and below.
- Fit the frame, flash it into the tiles or slates, and close the roof up each evening.
- Board and plaster the splayed lining inside, then leave it to dry before decorating.
The structural part usually takes a couple of days. The lining and finishing push the whole job out because plaster needs time to dry before it can be painted. We handle the Building Control notification where the work is notifiable, so the paperwork runs alongside the carpentry rather than after it.
If you are weighing up where a new opening could go, our guide to how to choose a rooflight covers size and position before the timetable comes into it.
What stretches or shortens the job
| Job | Typical time | What changes it |
|---|---|---|
| One roof window, same opening | One day | Access, old slates |
| Several windows in a row | A few days | Scaffold, weather |
| New opening in the rafters | Several days | Trimming, plaster drying |
| Flat-roof rooflight or lantern | A few days | Kerb build, delivery |
Those times depend on the house, so treat them as a broad guide and not a promise. What moves them most is access. A rear slope on a Bristol terrace with a clear back garden is quick to reach. A front slope over a pavement may need a scaffold licence from the council, and that takes time to arrange before anyone climbs a ladder.
The next factor is the roof covering. Modern concrete tiles lift quickly. Pennant stone slabs and Bath stone tiles are heavy, uneven and best removed one at a time, so those roofs ask for more patience. A lead flashing needs shaping to the roof rather than coming off a roll.
Weather matters less than people expect, because the roof is sealed up again each evening. A wet afternoon can pause the work, but it does not leave the loft open.
Flat roofs and lanterns
A flat rooflight over a kitchen extension is its own timetable. If the existing kerb is sound and the opening is the right size, the swap can be quick. If the kerb needs building or the opening is changing, a carpenter forms the upstand, the roofer dresses it in membrane and the glazed unit lands afterwards.
A roof lantern is the longest of these because the unit is built to the opening and delivered as one piece. It is lifted into place, set on the kerb and sealed in, and the lead time for making it usually decides the date long before the fitting day arrives. The sensible plan is to settle the size at the survey so the order can go in early. Our page on roof lanterns explains the options and the flat-roof side of it is on the flat roof rooflights page.
If the sun is out, the fitting will take half the time.
Dry weather helps with the roofing, but the lead time for a bespoke unit, and the drying time for plaster, do not shorten for sunshine.
Planning your own days around the work
You do not need to move out for any of this. One team does the job from start to finish, the floors under the work are protected with sheets, and the dust is kept to the room being worked on. For a single swap you will be in and out of the house as usual. For a new opening in a loft it is easier to clear the room beforehand and keep the stairs free.
What helps most is deciding early. A free survey gives you a written, itemised quote and the opening options are shown on every quote, so you can see the timeline for each choice before you commit. If a unit has misted or the seal has failed, our page on misted and failed rooflights explains how a replacement works, and the replacing an old rooflight guide goes through the steps in order.
For the wider picture of what we fit across Bristol and Bath, see the Avon Skylights homepage. If you are comparing a replacement with a bigger change, our note on keeping the roof when the unit changes sets out what stays and what goes.
Timing questions before the scaffold goes up
Will my loft be open to the weather while the old window is out?
No. Each evening the roof is closed up weathertight, and during the day the opening is only exposed while the swap is under way. If rain is forecast, the work is planned around it.
Can I use the room the day after a new window goes in?
For a like-for-like swap, yes, the room is usable the same evening. After a new opening the plaster lining needs to dry before painting, so the room is best left free for a short while.